BATCH
START10:13
ARRIVED10:35
STARTED
POUR10:46
FINISHED
POUR10:58
LEFT SITE11:02
ELAPSED49 MIN
AUTHORIZATION
TO ADD WATER
BY: _________
GAL: ___ ADDED: ___
The seller assumes no responsibility for strength if water is added at the job site.
Date05/12/25
Truck No207
DriverMARON, J.
Slump4.0
Plant CodeRVS-03
Job4471
INTEGRA TICKET READER
DR. NO. 84158
ORDER NOAE180
CUSTOMER NO00252
BATCH TIME10:13 AM
CERTIFIEDYES
CUSTOMERRIVERSIDE PUMP STATION — JOB 4471
DELIVERY: 840 N. MAIN ST, LOT ON BOX ST, RIVERSIDE CA 92501
PURCHASE ORDERPO-20104
COST CODE03-310
| Product No | Description | | Quantity | Unit Price | Amount |
| 1B3000RA |
3000 PSI, 3/4 STONE |
YD |
18.0 |
$142.00 |
$2,556.00 |
| 6001 |
CALCIUM CHLORIDE (50LB BAG) |
|
1.00 |
$8.00 |
$8.00 |
| 5035 |
SATURDAY DELIVERY CHARGE |
|
|
|
$0.00 |
WARRANTIES: DRIVERS ARE PROHIBITED FROM DELIVERING CONCRETE EXCEPT
UNDER THE TRUCK'S OWN POWER, AND WHERE SITE CONDITIONS PERMIT THE
SAFE AND PROPER OPERATION OF HIS EQUIPMENT. SELLER'S TRUCKS NOT
PERMITTED TO GO BEYOND ROAD OR STREET CURBS WITHOUT PURCHASER'S
AUTHORIZATION AND RISK AND SELLER WILL NOT BE RESPONSIBLE FOR DAMAGE
WITHIN CURBS OR PROPERTY LINE. WATER ADDED TO THE MIX AFTER LEAVING
PLANT ONLY UPON PURCHASER'S AUTHORIZATION AND RISK.
TOTAL ORDER14.00
YARDS TODAY18.0
YARDS PREV0.00
SUBTOTAL$2,564.00
TAX—
COLLECT / GRAND TOTAL$2,564.00
DRIVER
J. Maron
CUSTOMER ACCEPTANCE — RECEIVED BY
X
R. Gutierrez
| Material Type | Material | Target Wgt | Actual Wgt | Moisture % |
| WATER | WATER | 215 | 216 | |
| WATER | HOT WATER | 0 | 0 | |
| CEMENT | Cement — Dragon | 4000 | 4065 | |
| AGGREGATE | 3/4" Stone | 10520 | 10460 | 2.50 |
| AGGREGATE | 3/8" Stone | 2590 | 2610 | 1.20 |
| AGGREGATE | Sand | 12380 | 11970 | 3.20 |
| ADMIX | MasterAir AE200 | 4.00 | 4 | |
| ADMIX | Master Glenium | 60.00 | 60 | 0.00 |